Marcont Structures is a leader in the metallurgical industry at the national level and a reference player at the continental level.

Recent Articles

Zone industrielle Bouznika lot N° 186, Province de Benslimane, Maroc. +212 537 745 699 info@marcont.ma
Back to top
Image Alt

Equipements

Signed Marcont Structures

Discover the equipment and accessories for tall masts

STANDARD STRAIGHT SLEEPERS

• Single flange straight crossbars
400 or 1100 right

ReferenceL (m)SectionQ.flangesTotal weight (Kg)SCX (m²)
TR 400 SB0,4U 100140,05
TR 1100 SB1,1U 1001100,15
TR 1100 DB1,1U 1402140,21
TR 1500 DB1,5U 1402210,29
TR 2000 DB2,0U 1402230,41

The crossbars can be mounted on any type of support, from functional poles to large lighting poles. They are light, easy to install, and the diversity of the range makes it possible to create any type of configuration.

• Double flange straight crossbar
1100, 1500 or 2000 straight
• Crossbar for top mounting
400, 1100 or 1500

Reference L (m)SectionTotal weight (Kg)SCX (m²)
TR Top 4000,4U 140140.03
TR Top 11001,1U 140250.05
TR Top 15001,5U 140320.06

The straight crossbars are mounted on masts with a head Ø varying from :
60 to 205 mm (crossbar 1 flange)
76 to 205 mm (2-flange crossbar)

ADVANCED STRAIGHT SLEEPERS

• Crossbar 2770 right

ReferenceL (m)SectionTotal weight (Kg)SCX (m²)
TR DA 27602,76U 80410,38

BROKEN SLEEPERS

• Broken crossbar 2714

ReferenceL (m)SectionRebound length (m)
TR KC 27142,714U 1400,75

CURVED SLEEPERS

• Curved crossbar 1100
• Crossbeam 1840 curved

ReferenceL (m)SectionTotal weight (Kg)SCX (m²)
TR 1100 2/41,1U 80200,15
TR 1840 2/41,84U 80260,25
TR 1840 3/61,84U 80300,25

Curved crossbeams of equivalent capacity to straight crossbeams can be offered to improve the aesthetics of the masthead. They are lighter and offer less wind resistance.

CROSSBEAMS

• 3 Arms – Crosspiece S500 3 arms
• 4 Arms – Crosspiece S500 4 arms

ReferenceL (m)SectionRebound length (m)
TR Croix 500 (3 bras)0,5260,02
TR Croix 500 (4 bras)0,5300,03

for top masts 60,76,89 and 101

FIXED SQUARE CROSSPIECES

• Square crossbar – top 500 or 1200 mm

ReferenceL (m)SectionRebound length (m)
TR Croix 500 (3 bras)0,5260,02
TR Croix 500 (4 bras)0,5300,03

for top masts 60,76,89 and 101

A reinforced fixed crown of 4 m diameter has been developed to support a large number of projectors (up to 30 mounted and suspended projectors), or very large projectors. This crown can only be mounted on high masts.

CIRCULAR SLEEPERS

• Circular Crosspiece – 100, 1500 or 2000 mm

ReferenceL (m)SectionRebound length (m)
TR Circulaire 10001620,11
TR Circulaire 15001,5850,18
TR Circulaire 200021360,30

for top masts 60,76,89,101 and 106

The fixed crowns can be mounted on most masts (head Ø between 89 and 258 mm), from functional masts to large lighting masts, for 360° lighting.

PLATFORM

Large steel masts equipment

For high masts with a number of projectors ranging from 4 to 24, it is necessary to have a platform for the maintenance of the projectors. This platform is attached to the back of the mast independently of the crossbeams by means of clamps.

MAINTENANCE GATEWAY

Large steel masts equipment

For high masts with a number of projectors ranging from 4 to 24, a platform is required for the maintenance of the projectors. This platform is fixed independently of the crossbars, at the rear of the mast, by means of clamps

AERIAL BUCKET

Large steel masts equipment

For high masts with a number of projectors ranging from 4 to 24, it is necessary to have a platform for the maintenance of the projectors. This platform is attached to the back of the mast independently of the crossbeams by means of clamps.

ACCESS

The masts can be equipped with an access system to carry out the maintenance of the projectors. This system is composed of a rung and a life line (cable and its fall arrestor).

SCALES

26 mm wide anti-slip rungs, in accordance with the NF EN ISO 14 1424 standard Staggered installation every 300 mm from a height of 3 m (anti-vandalism).

RESTING LEVEL

The rest bearing is mechanically fixed by screws or clamps on the mast at maximum every 6 m. It consists of two folding steps that rest on the mast to allow the operator to pass.

FALL PREVENTION SYSTEM

(according to EN 353-1)

• High anchorage point of the fall arrest system welded to the mast in compliance with the NF EN 795 standard.

• Stainless steel cable Ø 8 mm with thimbled loop and CE marked carabiner.

• Deflection limiter placed every 10 m maximum to keep the cable at a distance and avoid it slamming on the mast.

• Cable attached to the low anchor point welded to the mast with a tensioner and a compensation spring.

• Optional fall arrest harness with energy dissipator.

LADDER SUPPORT

Plates fixed on the low anchor point of the lifeline allowing the installation of a ladder on the mast and the access to the first rungs.

PROTECTION

PROTECTION IN TUBE Ø 60

Options :
– Fixations on plates
– Powder coated paint

Meet Our Experts

Marcont Structures

We are ready to accompany you in the realization of each project.

Follow us

Facebook

YouTube

Instagram

LinkedIn

Contact us

    [dynamictext* your-subject "CF7_get_post_var key='title'"]